PACHON PROJECT

Province: SAN JUAN
Client: GLENCORE PACHON S.A.

Description:

Heavy Machinery Service oriented to earthworks in the reopening and
maintenance of the access road to the El Pachón project, road construction
interiors (opening, reopening and maintenance), drilling platforms (opening,
reopening and maintenance) and other works (trenches, ditches, pits, works of art, etc.) in the exploration area of the El Pachón Project and others.

Duration: 5 Months
Date: December 2019

NORTH LEACHING VALLEY, MINA GUALCAMAYO

Province: SAN JUAN
Town: Jachal
Client: MASS

Description:

Soil movements, excavations, transport from the quarry, filling, compacting and profiling to receive the membranes, later the installation of the geomembrane, geotextiles and pipes of the North Pad, as well as all the additional activities related and related to these topics.

Soil movement of the order of 250,000 m3, and 250,000 m2 of installed geomembrane surface

Duration: 15 Months
Date: May 2011

INSTALLATION AND INFRASTRUCTURE PRE-ASSEMBLY COURTYARD CONTRACT BEASA 612CC

Province: SAN JUAN
Town: Albardon
Client: BEASA

Description:

Building Infrastructure and Installations of six Sheds of approximately 1000m2 each in the Industrial Park of the Municipality of Albardon. B-01 Siding Formwork and Armor
C-02 Shed Consumables Warehouse.
E-01 Tinglado Blacksmithing
E-02 Tinglado Mechanical and Electrical Maintenance.
F-01 Shed Painting and Adjustments
G-02 Shed Piping and Fittings Warehouse Installations for reception and distribution of Electric Power, Beach lighting system and land perimeter. Buried electrical pipes. Lighting and power installations in sheds and sheds. Grounding and protection against atmospheric discharges.

Duration: 9 months
Date: July 2010

CONSTRUCTION SERVICE OF THE NEW BYPASS CHANNELS IN VELADERO MINE

Province: SAN JUAN
Location: Rawson – July 9
Client: Department of Hydraulics

Description:

Movement of Soils, Massive Cut in Soil and Rock, Placement of Soil Liner and Cover, Placement of Geomembrane and Geotextile and Execution of Pipes of the Collector System.

Duration: 8 Months
Date: April 2013

PHASE 5 STORAGE MATERIAL TRANSPORTATION SERVICE
VELADERO PROJECT

Province: SAN JUAN
Location: Iglesia
Client: MINERA ARGENTINA GOLD S.A.

Description:

Transport of 235,000 m3 average distance 2 km.

Duration: 3 Months
Date: August 2012

31
Mining service contracts made.-