GRAN TULUM AQUEDUCT - SAN JUAN

Province: SAN JUAN
Town: Zonda – Ullum – Rivadavia
Client: O.S.S.E. / WATER RESOURCES OF THE NATION

CLOACAL SYSTEM - POCITO

Province: SAN JUAN
Town: Pocito
Client: Obras Sanitarias Sociedad del Estado San Juan

Description:

Home connections: 970 home connections of 110 mm diameter.

Pipe installation: a total of 87,500 meters that make up the PVCRCP pipe collection network- in diameters 160, 250; 315 mm. diameter

Expansion of the “Cerrillo Barboza.” Sewage Liquid Treatment Plant

In the Cerrillo Barboza Treatment Plant, an expansion was made through the construction of a series of lagoons, consisting of a primary lagoon followed by a secondary one of the elongated type, foreseeing the waterproofing of the lagoons using P.E.A.D. to avoid leaks to the subsoil.

Execution period: 22 months

Start: February 2017 (finished)

Installation of natural gas network, water distribution network and nexus pipes, electrical network in L.M.T. and L.B.T., together with the installation of public lighting in BARRIO A.T.S.A.,

Province: SAN JUAN
Town: Rivadavia
Client:: Provincial Housing Institute.

Description: Supply to 250 individual houses
Date: 1995-1996

55
Installed infrastructure networks.-