Province: SAN JUAN
Town: Sorocayense-Calingasta
Client: D.P.V.
Description: Length 325 meters. Construction area: 21,440.00 m2
Foundation on excavated piles, post-tensioned beams in situ, embankment, sub-base shoulders, base, TBD, metal railings New Jersey railings, pedestrian railings
In the Longitudinal Direction, there are twelve sections of 25.00 m each, with a total length of the Bridge of 300 m. work: Sup. 21,440.00 m2. In the Transverse Direction, the Superstructure of this work is made up of a 8.30m wide two-way carriageway and two 1.65m wide pedestrian lanes, giving a total width of the bridge of 11.60m
Duration: 27 Months
Date: September 2006